Ceramic Tile




Backer board installed overwood floor , center row of tile placed for spacing .







Tiles mortared into place in the window bay





All tile set in floor and grount is being applied













Tile added to stairway landing, treads covered


with laminate and edged with metal trim






Repaired rotted floor under Toilet


New Cement Base
Installed
Toilet Replaced

Concrete Steps


Old Steps
Old Concrete removed
and Forms built





New Concrete being mixed

Tub Surround Renovation 2










Old Tub Surround
New Faucet And Drywall Install


Tub Surround Finish


Portico












Anchors to the house installed


Framing for ceiling and roof











Roofing work
Finished job




Replace old Window



Old Window


New Vinyl Window

Repair roof , including replace rotted decking and joists



Old Hot
Roof Removed


Replace Rotted Joist

New Decking


Emulsion Applied



New Rubberized roof Installed

Tub Surround Renovation


Old Tub Surround

Before




In Process
New Tub Surround

Bathroom Remodeling

Before




New Walls







Before - Plumbing Hot Water /Drain/Cool Water - After










New Vanity and Toilet

New Bathroom Ceiling

"Washer and dryer installation in new location"


Hole cut in wall for utility access


Plumbing
Hot/Cool water and Drain


Washer and dryer
up and running


Electrical Work
Outlet 220 Volts+
Plumbing

Electrical and
Plumbing Finish


Office Renovation





Framing Walls
Drywall and
Electrical Work









Taping and
Joint Compound


Finished

Deteriorated window bay, West Philadelphia


Before
In process




After

Patch and Refinish Damaged Wall





In process

Finished Wall

Open wall over fireplace for access to faulty plumbing, and rebuild



Expose Piping
Close Wall





Finished Wall